A large Coleman cooler on wheels, some reusable Cooler Shock ice packs, and eight dozen bottles of gatorade.
Beginning on 5/16 I'm having all the old siding on my 1971 ranch house replaced with Hardie plank lap siding. A few days after that's done, a second team will arrive to power wash the whole house and paint the soffits/fascia/frieze boards/shutters/door cases and the garage door. Then they will wash and stain the deck. The first total facelift the house has had in 25 years!
In total they should be here for a full 7 working days. I intend to keep the cooler stocked at all times. It's hot as heck in NC and these guys work very hard.